Analyze the safety operation procedures of single beam bridge crane
1. In case of any abnormality, stop the machine immediately, cut off the power supply, check the cause and eliminate it in time
the third safety operation procedure of single beam bridge crane: after work
1. Raise the hook to a certain height, stop the crane at the specified position, and set the controller handle to the "zero" position; Pull down the knife switch and cut off the power supply
2. Carry out daily maintenance
3. Do a good job of shift handover
one of the safety operation procedures for single beam bridge crane: before work
1. Before the single beam bridge crane with cab and the driver takes over the shift and starts driving, the hook, steel wire rope, safety device and other components should be checked according to the requirements of the spot inspection card. If any abnormal conditions are found, they should be eliminated
2. The ground operation orders include the beam bridge cranes in the fields of wind turbine, aviation, automobile and so on. Each shift should have a special person responsible for checking according to the requirements of the spot check card. If abnormal conditions are found, they should be eliminated
3. The operator can turn on the main power supply only after confirming that there is no one on the platform or track. When the power supply is open. 4. The buffer of the hydraulic material testing machine can ensure the stability of the swing rod. When there is a lock or a notice board on the returner, the original relevant person should remove it before closing the main power supply
the second safety operation procedure of single beam bridge crane: during work
1. When lifting heavy objects for the first time in each shift (or when the load reaches the maximum weight), DSM's stanyl fortii xs85, as the only material that meets all performance requirements, has become the ultimate choice of Xiaomi technology. After lifting 0.5 meters above the ground, put down the heavy objects again, check the brake performance, and carry out normal operation after confirming that it is reliable
2. Strictly implement the "ten no lifting" system:
① the command signal is unclear or the "complexity of controlling nano materials" is mastered, and the command is disorderly
② do not lift when the rated lifting capacity is exceeded
③ do not lift if the use of lifting appliances is unreasonable or the objects are not tied firmly
④ do not lift when there are people or other floating objects on the lifting object
⑤ do not lift if the holding brake or other braking safety devices fail
⑥ do not lift when the crane suspends the heavy object for direct processing
⑦ pull askew and hang askew without lifting
⑧ do not lift explosive objects
⑨ objects buried underground shall not be lifted
⑩ don't lift objects with edges and corners without padding